Your CTOT changed: what business jet crew do next, step by step
When an SRM moves your slot, comply with the new CTOT, work out the latest off-blocks (the new CTOT minus the TAXITIME), tell ops and the handler without moving the EOBT for the delay, then check your FDP, rest and the destination at the new times. Galley reads ForeFlight’s slot e-mails and sends a push only when the CTOT moves.
The SRM arrives while the passengers are in the FBO lounge: the CTOT has moved 35 minutes. The handler wants a new time for the catering, ops are calling, and the first question in the cockpit is whether the day still works. In CTOT, slots and A-CDM, explained I put each term and number next to the text that defines it. This guide is the other half: the order I work through when the slot changes, with the rule behind each step.
None of it is a solo job. The crew, ops, the handler and the tower each hold a piece of the slot, and a delay usually grows when one of them hears about the change last.
1. Read what changed
Three messages change your plan, and each asks something different of you:
- SRM, a new CTOT. EUROCONTROL’s answer to “What action do I take if I receive a SRM?” is one line: “Comply with the new CTOT stated in the message” (ATFCM Users Manual §2.2). The Network Manager (NM) sends one for a change of more than 5 minutes, in reply to a DLA, CHG or DPI, for an improvement, or when the most penalising regulation changes (§8.2.3.2).
- SLC, the slot is cancelled. The regulation no longer applies to you, but “An SLC does not guarantee that the flight will not be subject to further regulations” (§8.2.3.5). If the SLC comes after EOBT + 15 minutes, ops send a DLA or CHG with a new EOBT (§2.2).
- FLS, the flight is suspended. Wait for the next message: “The TWR of departure should not let the aircraft start-up / depart before such a message (DES or SAM) is received” (§9.3).
Then read the REGCAUSE field: it says why you are waiting (the letters are here). A W for weather with an A for arrival changes what you check in step 5.
2. Work out the new times
Two times matter: the new CTOT and the latest off-blocks time that still makes it. The SRM carries both pieces, the NEWCTOT and the TAXITIME (Appendix B.1). The manual calls the latest off-blocks time the COBT, “CTOT –Taxi time” (§8.4.3). A made-up SRM:
-TITLE SRM -ARCID GLY21 -ADEP LSGG -ADES EGLF -EOBT 1940 -NEWCTOT 2050 -TAXITIME 0012 -REGCAUSE CE 81
- Latest off-blocks: 20:50 − 12 minutes = 20:38Z.
- The window: 20:45 to 21:00Z. It is ATC’s, “only to organise the departure sequence” (Appendix F), so plan to be airborne at 20:50, not at 21:00.
- The new arrival: the CTOT plus the planned flight time, here 1 hour 15: on the ground at Farnborough at about 22:05Z. Step 5 shows why that number matters.
The 12 minutes are NM’s “average taxiing time for the runway in use” (§8.2.3.1), not your taxi. From a remote stand or with de-icing, plan to be off blocks earlier.
3. Tell ops and the handler
Ops own the flight plan, and the flight plan is how NM knows what you can do. Three rules keep it right:
- Don’t move the EOBT to match the CTOT. “An AO should not modify the EOBT to a later time simply as a result of an ATFCM delay (CTOT)” (§6.3.1). The EOBT stays the earliest time you can be off blocks.
- Change the EOBT when something else moves it. When late passengers, fuel or a fix put you more than 15 minutes behind the EOBT, ops send a DLA or CHG: “A DLA message shall be sent for any change of EOBT greater than 15 minutes” (§6.3.3; IFPS Users Manual §3). If the new EOBT still makes the CTOT, the slot stays; if not, “the next available slot will be issued in a SRM” (§2.2).
- At an A-CDM airport, update the TOBT. “Update your TOBT as soon as you are aware of the change” (§2.2). The operator or its handler sets the TOBT, not the pilot (how the TOBT works), so call your handler early.
Then the people who plan around you: the passengers’ show time, the caterer’s delivery, the fuel truck and the handler at the destination. A new time that reaches all of them in the first few minutes saves most of the calls later.
4. Check your duty with the new times
A slot moves your flight duty period (FDP), and how it counts depends on whether you have already reported. The rules below are ORO.FTL and CS FTL.1. If your operator flies air taxi, your OM-A is built on EU-OPS Subpart Q and national rules instead (which scheme applies): the steps are the same, the numbers are your OM-A’s.
Before you report: delayed reporting. When ops move your report before you leave the hotel or home, that is delayed reporting, “the postponement of a scheduled FDP by the operator before a crew member has left the place of rest” (ORO.FTL.105(7)). It needs a procedure in your OM-A (ORO.FTL.205(g)), and CS FTL.1.205(d) sets how the FDP counts:
- a delay of less than 4 hours: the maximum FDP comes from the original report time, and the FDP counts from the delayed one;
- 4 hours or more: the maximum comes from the more limiting of the two report times;
- a second change: the FDP “starts counting 1 hour after the second notification or at the original delayed reporting time if this is earlier”;
- a delay of 10 hours or more, with no further disturbance from the operator, counts as rest.
The roster check guide works through two delays with the numbers.
After you report: the FDP is running. It started at your report and ends when the aircraft comes to rest after the last sector you operate (ORO.FTL.105(12)). Thirty-five minutes of slot delay make it 35 minutes longer, so compare the new last on-blocks with the maximum for your report time and sectors (how to read the table). Commander’s discretion is for “unforeseen circumstances in flight operations, which start at or after the reporting time” (ORO.FTL.205(f)(1)): up to 2 hours (3 with an augmented crew), counted from the maximum without any planned extension (GM1 ORO.FTL.205(f)(1)(i)), and decided by the commander after consulting all crew members on their alertness (point (f)(3)). An extension that wasn’t planned can’t be added on the day (the rule).
The rest after moves too. A later on-blocks makes the duty longer, and the rest before the next FDP must be at least as long as that duty, or 10 hours away from home base (ORO.FTL.235(b)). If tomorrow’s report is fixed, tell ops now, not from the hotel.
Cabin crew: if you reported before the flight crew, your FDP started at your own report, and ORO.FTL.205(c) extends your maximum by the difference, at most 1 hour.
5. Check the other end: opening hours, weather, the handler
A slot moves the arrival as much as the departure, and the manual leaves that check with the operator: “the AO is responsible to check that the airport is fully operational before commencing the flight” (§9.4).
Opening hours are where a business jet evening breaks most often. Farnborough is a good example. Its AIP gives the hours as Monday to Friday 07:00–22:00 UTC in winter (06:00–21:00 UTC in summer), shorter at weekends (UK AIP EGLF AD 2.3), and its local regulations say:
“Aircraft are prohibited from departing and arriving outside the operational hours notified at EGLF AD 2.3 paragraph 1, and at any time on the 25 and 26 December.”
Inbound aircraft must also be at or below 4,000 ft and within 12 track miles of touchdown by the closing time minus 5 minutes (EGLF AD 2.20). In the example from step 2, a 20:50Z CTOT puts GLY21 on the ground at about 22:05Z on a winter weekday, after Farnborough has closed. Ops then need a better slot, another airport or another plan, and the earlier they know, the more of those are left.
At the new arrival time, also check:
- the weather, more so when the regulation is for weather at your destination;
- the NOTAMs: an airport closed by NOTAM may get no regulation at all, because “A zero rate regulation, which will suspend the flight in the ETFMS, is not compulsory if there is a NOTAM prohibiting take-off and landing in an aerodrome” (§9.4);
- the destination handler, customs and the crew transport, who are still working to the old time.
6. Ask for a better slot the right way
- Improvements come by themselves. “All flight plans are by default in RFI status”, and a flight in RFI status receives an SRM as soon as an improvement is possible (§7.1). You don’t need to ask for it.
- Ready early? With the doors closed, ops or the crew can ask the tower to send a Ready (REA) message (§7.3). “The REA message can only be sent by ATC following a request from AO”, from 15 minutes before the EOBT at the earliest (§7.3.1).
- Tell NM the earliest take-off time you can make. Ops can send it through the e-Helpdesk, which “can increase the likelihood of getting the requested improvement” (§8.4.1). “Do not request improvements for flights which have no delay” (§8.4.1), and the helpdesk is not for every delayed flight (§8.4).
- Another route or level. A regulation covers one piece of airspace, and ops can file around it with a CHG, or by cancelling and re-filing. The manual’s advice: “Investigate alternative routes that avoid congested areas” (§2.2).
- No e-Helpdesk at your operator? NM’s telephone service “is reserved for business aviation and those who do not have internet access” (§8.4), and “Business jet users should contact EBAA (European Business Aviation Association) for details on how to access help services” (§8.4.2).
7. When you can’t make the slot
- Tell NM at once. At an airport without A-CDM: “As soon as possible send a DLA / CHG stating your new EOBT or send a SMM, if your new EOBT is not known, to ensure that the slot can be reused and to minimise your risk of substantial delay” (§2.2). At an A-CDM airport, the same answer is the TOBT update.
- An extension is 10 minutes, once. Ops can ask the NM helpdesk for it only in the 20 minutes before the COBT; at or after the COBT, the tower or the flow management position coordinates it with NM. “Only one CTOT extension per flight is allowed” (§2.2, §8.4.3).
- At an A-CDM airport, the pilot asks. “If your flight has received start-up approval only the pilot can call the TWR (over the frequency) for a slot extension. If your flight has not received start-up approval an update of the TOBT is required” (§2.2).
The CTOT guide covers the traps in this step: a DLA can’t make the EOBT earlier, and a second flight plan is not the fix.
The sequence on one card
| Step | What to check | Where it comes from |
|---|---|---|
| 1. The message | SRM: a new CTOT to comply with. SLC: no regulation now. FLS: no start-up until a DES or SAM | ATFCM Users Manual §2.2, §8.2.3.2, §8.2.3.5, §9.3 |
| 2. New times | Latest off-blocks = CTOT − TAXITIME. Take off at the CTOT; −5/+10 is ATC’s | §8.4.3, Appendix F |
| 3. Ops and handler | EOBT unchanged for slot delay; DLA or CHG for your own delay over 15 minutes; TOBT at A-CDM airports | §6.3.1, §6.3.3, §2.2; IFPS Users Manual §3 |
| 4. Your duty | Delayed reporting before report; the FDP and the rest after once you have reported | ORO.FTL.105(7), (12), ORO.FTL.205(c), (f), (g), ORO.FTL.235(b); CS FTL.1.205(d) |
| 5. Destination | Opening hours, weather and NOTAMs at the new arrival time; the handler there | §9.4; the destination’s AIP, AD 2.3 and AD 2.20 |
| 6. A better slot | RFI by default; REA through the tower; earliest take-off time via the e-Helpdesk; another route | §7.1, §7.3, §8.4.1, §2.2 |
| 7. Can’t make it | DLA, CHG or SMM at once; one 10-minute extension, asked in the 20 minutes before the COBT | §2.2, §8.4.3 |
What Galley does with a new slot
I built slot alerts in Galley for this moment. When ForeFlight’s slot e-mails go to your Galley roster address, Galley reads each SAM, SRM and SLC, attaches it to the leg on your roster and sends a push only when the CTOT moves or the slot is cancelled. Slot mode then shows the new CTOT, the latest off-blocks time from the message’s taxi time, where you are in the −5/+10 window, the change since the last message and the forecast at the new arrival time. For pilots whose FTL Galley checks, it also runs the duty with the new times against your scheme (step 4). If your operator connects Leon, Leon’s FTL stays the reference, and Galley doesn’t put a second FDP next to it.
Slot mode doesn’t check the destination’s opening hours or PPR (step 5), and Galley sends nothing to NM: the messages in steps 3, 6 and 7 stay with ops, the handler and the tower. Slot alerts are free for pilots.
Questions crew ask
Does a slot delay make my FDP longer?
Once you have reported, yes: the FDP ends when the aircraft comes to rest after the last sector you operate (ORO.FTL.105(12)), so 35 minutes of slot delay make it 35 minutes longer. When ops move your report before you leave the hotel or home, that is delayed reporting, and CS FTL.1.205(d) sets how the FDP counts.
Can commander’s discretion cover a slot delay?
Commander’s discretion is for unforeseen circumstances in flight operations that start at or after the reporting time (ORO.FTL.205(f)(1)): up to 2 hours, or 3 with an augmented crew, counted from the maximum without any planned extension. The commander decides after consulting all crew members on their alertness. An extension that wasn’t planned can’t be added on the day.
Do ops send a DLA when the CTOT changes?
Not for the slot delay: an AO should not move the EOBT to a later time simply as a result of an ATFCM delay (§6.3.1). Ops send a DLA or CHG when something else, such as late passengers, fuel or a fix, puts you more than 15 minutes behind the EOBT. At an A-CDM airport, the operator or its handler updates the TOBT.
How do we ask for a better slot?
Improvements come by themselves: all flight plans are in RFI status by default and receive an SRM as soon as an improvement is possible. With the doors closed early, ops or the crew can ask the tower to send a Ready (REA) message, from 15 minutes before the EOBT. Ops can also send NM the earliest take-off time through the e-Helpdesk.
What if the new arrival time is after the destination closes?
The operator is responsible for checking that the airport is fully operational before the flight (ATFCM Users Manual §9.4). Farnborough prohibits arrivals outside the hours in its AIP (EGLF AD 2.3): a 20:50Z CTOT with 1 hour 15 of flight puts the aircraft on the ground at about 22:05Z, after it closes on a winter weekday. Ops then need a better slot, another airport or another plan.
Get your slot alerts in Galley
Related
- CTOT, slots and A-CDM, explained
- How to check your roster against EASA FTL and your OM-A
- EASA FTL for business aviation: the rules that catch crews out
Sources
- EUROCONTROL Network Manager, ATFCM Users Manual, Edition Wave 2.3 (validity 22 April 2026), the edition on EUROCONTROL’s site on 2 November 2026: §2.2 (FAQ), §6.3.1, §6.3.3, §7.1, §7.3, §7.3.1, §8.2.3.1, §8.2.3.2, §8.2.3.5, §8.4, §8.4.1, §8.4.2, §8.4.3, §9.3, §9.4; Appendix B.1 (SRM), Appendix F (slot window). https://www.eurocontrol.int/sites/default/files/2026-03/eurocontrol-atfcm-users-manual-wave-2-3.pdf
- EUROCONTROL Network Manager, IFPS Users Manual, Edition Wave 2.3 (validity 22 April 2026): §3 (changes of EOBT of more than 15 minutes). https://www.eurocontrol.int/sites/default/files/2026-04/eurocontrol-ifps-user-manual-wave-2-3-external.pdf
- Regulation (EU) No 965/2012, consolidated version of 25 May 2026: Annex III: ORO.FTL.105(7) and (12), ORO.FTL.205(c), (f) and (g), ORO.FTL.235(b). https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02012R0965-20260525
- EASA Easy Access Rules for Air Operations, Revision 24 (March 2026): CS FTL.1.205(d) delayed reporting (ED Decision 2023/023/R). https://www.easa.europa.eu/en/document-library/easy-access-rules/easy-access-rules-air-operations
- UK AIP, AD 2 EGLF Farnborough, AIRAC 29 October 2026: AD 2.3 operational hours (paragraph 1), AD 2.20 local aerodrome regulations. https://www.aurora.nats.co.uk/htmlAIP/Publications/2026-10-29-AIRAC/html/eAIP/EG-AD-2.EGLF-en-GB.html
- UK AIP, GEN 2.1 Measuring system, time system, AIRAC 29 October 2026: 2.2: times for the summer period are given in brackets. https://www.aurora.nats.co.uk/htmlAIP/Publications/2026-10-29-AIRAC/html/eAIP/EG-GEN-2.1-en-GB.html
Changes
- 2 November 2026: Written and checked against the texts above.
- 15 November 2026: A short answer at the top and the questions crew ask, both from this guide’s own text.
- 16 November 2026: The short answer comes first, in two sentences, and says what Galley does with a new slot. Galley Pro is free for crew while we launch.
- 23 November 2026: Galley is free for pilots and cabin crew (since 20 November 2026): the Galley Pro line is gone.